Bridge in final stage

DAMAULI: The under construction motorable bridge over the Madi River at Sisaghat that links Tanahun’s Shyamgha and Lamjung’s Madhya Nepal Municipality has reached its final stage.

”Construction of remaining 112 meter of the bridge will be completed within a month and at the cost of Rs 89.5 million,” said chairperson Sin Bahadur Gurung, of the construction committee.

Contractor Amar Bahadur Khatri, of Raptah Construction, said preparation towards gravelling, drainage management and black topping of around 500 meter road to Lamjung district’s Duipiple was under way.