Nepal

NEA approves Rs 1.57m compensation for child injured in Nawalparasi

By THT Online

The construction of 132 kV Gajryang-New Khimti double circuit transmission line, built for reliable and smooth power supply, increase transmission capacity up to 200 MW and control power leakage at local level, has been completed.

Key Takeaways:

  • Child injured after contact with 11 kV transmission line in Tribeni–2
  • Compensation to be disbursed via NEA's Susta East Distribution Centre
  • Minister directed NEA to strengthen inspection, monitoring and public safety awareness
KATHMANDU, JULY 23 The Nepal Electricity Authority (NEA) has decided to provide Rs 1.571 million in compensation and treatment support to a child who lost both arms after suffering an electric shock from an 11 kV transmission line in Nawalparasi (Susta East). The decision was approved by a recent meeting of the NEA Board of Directors. The child was injured while playing on the premises of an Ama Samuha building in Tribeni Rural Municipality–2. According to the NEA, the compensation amount will be disbursed to the victim's family through its Susta East Distribution Centre. Energy, Water Resources and Irrigation Minister Biraj Bhakta Shrestha said the assistance was approved in line with existing legal provisions and past practices. He also directed the NEA to strengthen inspection and maintenance of power infrastructure, enhance monitoring in high-risk areas, improve public safety awareness, and ensure timely dissemination of information to local communities to prevent similar incidents.