20 Years, To The Day: Krishnabhir's Wall Failed Exactly As Predicted
Published: 04:11 pm Sep 03, 2026
KATHMANDU Built in 2060 BS with a 20-year lifespan, the landslide-control wall at Krishnabhir has failed - blocking the Prithvi Highway's Mugling-Naubise section for three days and disrupting travel to Chitwan, Tanahun and Kaski. Watch till the end. Follow @thehimalayantimesnews for fast, verified news. #Krishnabhir #PrithviHighway #Nepal #TheHimalayanTimes #THTDigital