New track opening at Krishnabhir to restore Prithvi Highway link
Published: 01:13 pm Sep 04, 2026
Key Takeaways:
- Excavators opening new track seven metres above collapsed road section
- Planned track: 350m long, 7m wide, cut into hillside slope
- 200m of existing road subsided after Trishuli River swept away structures
- Government aims to restore Kathmandu connectivity within September