Bhotekoshi flood damages 55 drinking water projects, Rs 640m loss
Published: 11:41 am Sep 06, 2026
Key Takeaways:
- 55 drinking water projects damaged in Rasuwa, Nuwakot, Dhading and Gorkha
- Rs 640m preliminary losses, with Nuwakot worst-hit (22 projects, Rs 41m)
- 100 KVA generator deployed at Bidur Water Supply Project, distributing 500,000 litres daily
- Seven pumps installed to restore services for 500 Battar households
- Tankers, pumps, HDPE pipes prepared for Trishuli Bazaar and Belkotgadhi
- Technical teams repairing infrastructure; long-term restoration plans pending