Videos

Government Begins Repairs, Five Bridges Set To Reopen Within One Month

By THT Digital

Bhotekoshi Flood Damages Suspension Bridges

KATHMANDU Bridges damaged by the Bhote Koshi flood are being repaired in Nuwakot and Dhading. Along the Muglin-Timure route, 53 of 64 suspension bridges were damaged - 20 need repair, 33 need reconstruction, and five are set to reopen within a month. Stay tuned. Follow @the_himalayantimes for fast, verified news. #NepalFloods #InfrastructureRepair #NuwakotDhading #TheHimalayanTimes #THTDigital