Nepal

Narayangadh-Muglin road to remain closed five hours daily for landslide mitigation

By THT Online

File Photo

Key Takeaways:

  • The Narayangadh-Muglin road will be closed daily from 11 am to 4 pm
  • The restriction is linked to landslide prevention work at Tuinkhola
  • All vehicle movement will be halted during the closure period
  • Authorities are using rock removal, slope stabilisation and steel-anchor reinforcement techniques
  • The traffic disruption may continue for at least two weeks, subject to technical review
NARAYANGADH, NOVEMBER 28 Traffic on the Narayangadh-Muglin road section will remain suspended for five hours daily, from 11 am to 4 pm, as authorities carry out landslide prevention and slope-stabilisation work at the Tuinkhola area. The District Administration Office, Chitwan, has enforced the daily closure from November 20 until further notice to ensure the safety of road users while heavy works are underway. Assistant Chief District Officer Ishwari Prasad Sharma said all types of vehicles would be barred from the affected section during the closure period because of potential risks associated with the ongoing engineering works. Authorities said landslides have continued to occur at Tuinkhola despite the absence of monsoon rains, prompting the Bharatpur Road Division Office to adopt longer-term mitigation measures. The work includes the removal of unstable rocks, slope management, the use of the nailing technique to reinforce vulnerable sections with steel rods, and bio-engineering measures to stabilise the terrain. Officials estimate that traffic restrictions may need to remain in place for at least 15 days, although the exact duration will depend on ongoing technical assessments. Meanwhile, work at Ghoptebhir along the Prithvi Highway is expected to be completed by November 29, after which full attention will shift to the Tuinkhola section, according to authorities.