Nepal

Traffic movement resumes along Gulmi road a month later

Traffic movement resumes along Gulmi road a month later

By Rastriya Samachar Samiti

GULMI: The vehicular movement along the Ridi-Rudrabeni-Bamitaksar road stretch in Gulmi district has resumed after remaining shut for the last month. The road was shut down after swollen Badighat River eroded 700 metres of road stretch. Transportation resumed after a kilometre of alternate route was constructed near Urlikhola area and expansion of the road network at Sisne area of Rupakot took place, informed Tamghas Simaltari Road Project's sub-engineer Dinesh Ojha.