Vehicular movement resumes along Narayangadh-Muglin section
Vehicular movement resumes along Narayangadh-Muglin section
Published: 06:41 pm Jul 04, 2018
CHITWAN: Vehicular movement along Narayangadh-Muglin road section has resumed after eleven hours of obstruction due to landslides at various locations. The highway which was obstructed since 7:00 am this morning was opened around 4:35 pm after clearing debris. The road was blocked following separate landslides at Topekhola and Khalikhola along the highway this morning. The two-way traffic along the road resumed this afternoon, according to engineer Shiva Khanal, Narayangadh-Muglin road project. He further said two excavators and loaders were used in both the sites to clear the debris to resume the vehicular movement.