Vehicular movement along Chhahare-Tokha road resumes
NUWAKOT: Vehicular movement along the Chhahare-Tokha road section, which links Nuwakot with Kathmandu, has resumed from today.
The vehicular movement was obstructed after a landslide occurred at Gurje Bhanjyang, along the road section.
More than 200 stranded vehicles, following the landslide have headed towards their destinations with the resumption of traffic.
Locals, Nepal Police and Nepal Army personnel deployed from the Shivapuri National Park had removed the landslide debris with the help of excavator of the Nuwakot-based Division Road Office.