Correction
The report titled ‘Govt to award licence to bidder offering 12 MW free power’ in the January 7 edition of THT was factually wrong. The 12 MW, 7.5 MW and 21.9 MW figures actually stand for the offer of free power in percentage terms, not in MW terms as reported in the story. The error is regretted.