Monsoon induced flood hits Rudi Khola �A� hydel project LAMJUNG: Monsoon induced flood has rendered damage to the under-construction Rudi Khola ‘A’ hydropower project in Lamjung district. According to Deputy Project Manager Saroj Bhattarai, the flood has ravaged structures and road, construction... 05 Jul, 2018
94.8 MW to be connected to national grid this fiscal Kathmandu, May 9 Additional 94.8 megawatts of electricity generated from various hydroelectricity projects will be connected to the national grid within this fiscal. According to Nepal Electricity Authority (NEA) — the state-owned power utility... 10 May, 2018
Rudi 'A' hydroproject to generate electricity from mid-July LAMJUNG: The Rudi 'A' Hydropower Project with 8.8 Megawatt (MW) capacity is preparing to generate electricity within mid-July. The under construction hydropower project over Rudi Khola located at the border of Kaski and Lamjung districts has... Travel 04 May, 2018