Road survey resumes
GAJURI: The survey of road connecting Galchhi to Rasuwa of Prithavi Hig-hway has been resumed. It will be developed into a transit point after Galchhi-Syaphrubesi road is constructed.
GAJURI: The survey of road connecting Galchhi to Rasuwa of Prithavi Hig-hway has been resumed. It will be developed into a transit point after Galchhi-Syaphrubesi road is constructed.