KATHMANDU

Nepal Army engineers are fast-tracking a 60-metre, 5.5-metre wide Acrow bridge over the Tadi River in Devighat, Nuwakot, after floods damaged the local bridge and road. The bridge can carry 50 tonnes and should restore traffic within days.

Follow @thehimalayantimesnews for fast, verified news.

#NuwakotFloods #NepalArmy #Devighat# TheHimalayanTimes #THTDigital