KATHAMNDU
The Nepali Army's Engineering Force has begun installing a 240-foot Bailey Bridge with 60-tonne capacity over Falakhu Khola in Betrawati after building a 300-metre access road. The bridge is expected to ease road connectivity for flood-affected Nuwakot and Rasuwa. Stay tuned for updates.
Follow @thehimalayantimesnews for fast, verified news.
#NepaliArmy #Betrawati #BridgeConstruction #TheHimalayanTimes #THTDigital
