Nepal

Vehicular movement resumes on Jomsom road

Vehicular movement resumes on Jomsom road

By Rastriya Samachar Samiti

A motorcyclist is stranded as a landslide obstructs the Beni-Jomsom road section, in Myagdi district on Saturday, September 3, 2016. Photo: RSS

Thini, December 31 The Beni-Jomsom road that connects the trans-Himalayan district of Mustang with the rest of the country has been opened for traffic after four days of obstruction. The road was blocked after a dry landslide occurred at Guithebhir of Annapurna Rural Municipality in Myagdi. The road was obstructed by the landslide debris deposited on the highway since December 27. The 76-km road was opened for traffic after the landslide debris was cleared last evening. Vehicles bound to Jomsom from Beni and vice-versa were stranded after the obstruction of the road. Meanwhile, traffic along the Beni-Jomsom road will be stopped for eight hours daily to carry out road upgradation and expansion work.