KIMATHANKA, FEBRUARY 6
The Koshi Highway obstructed by the dry landslide has resumed after two days.
The highway was blocked in the section of Khandbari-Kimathanka in the district, according to chief engineer at North-South Road Office, Sabin Koirala.
Huge stones fallen onto the road blocked the traffic, thereby causing sheer inconvenience to the people from northern belt, Bhotkhola. The road is linked to Changa and Denda of Tibet.
Similarly, many vehicles to and from Bhotkhola were stranded along the way.
Even an excavator operator was injured while clearing the obstruction on Sunday morning.