Disrupted Sanfe-Martadi road in limbo The disrupted Amkot stretch along the Sanfe-Martadi road section of Bajura is unlikely to resume before Dashain this year. Nepal 30 Sep, 2022
Sanfe-Martadi Road section obstructed since two weeks; food price hits sky The Sanfe-Martadi road section in Bajura district that has been obstructed for the last two weeks, is yet to be cleared. Nepal 28 Jun, 2021
Flood, landslide disrupt Sanfe-Martadi road Floods and landslides have disrupted the Sanfe-Martadi road section in Bajura since Thursday. Nepal 08 May, 2021
Sanfe-Martadi road stretch faces landslip risk Bajura’s Sanfe-Martadi road section is at high risk of landslide. Nepal 16 Apr, 2021
Bailey bridge construction over Budhiganga River completed, vehicular movement resumes along Sanfe-Martadi road section The construction of a bailey bridge over the Budhiganga River in Badimalika Municipality along the Sange-Martadi road section of Bajura has been completed following which vehicular movement has resumed. Nepal 11 Feb, 2021
Motorable wooden bridge constructed over Budhiganga river in Bajura BAJURA: A motorable wooden bridge has been constructed over Budhiganga river along the Sanfe-Martadi road section in Bajura district. Badimalika Municipality built the bridge after construction of a bailey bridge was delayed. The bridge has come... Travel 29 Dec, 2020
Home minister meets flood victims in Bajura Bajura, August 18 Home Minister Ram Bahadur Thapa arrived in Bajura with a team to inspect the condition of monsoon-related disaster victims. According to Chief District Officer Krishna Gaihre of Bajura, the team also included Nepal Communist... Travel 19 Aug, 2020
Bajura's Olena village at risk of landslide, flood BAJURA: Olena village in Badimalika Municipality-4 of Bajura district is at the risk of landslide and flood. The swollen Budhiganga River has eroded the earth while there is also the risk of landslides that could occur from two sides of the... Travel 13 Aug, 2020
Bajura ravaged by catastrophic flood; connection with district headquarters severed BAJURA: The swelling of Budhiganga river induced by incessant downpour has swept away the bailey bridge along the Sanfe-Martadi road-section, on Sunday. Following the damage to the bridge, the connection to district headquarters Martadi has been... Travel 10 Aug, 2020
Sanfe-Martadi road obstructed since last month BAJURA: The Sanfe-Martadi road section in Bajura district, movement along which has been obstructed since last month due to landslide and flood, has yet to come into operation. Due to persistent rainfall, various locations between Taprisera-Tipada... Travel 09 Aug, 2020
Roadside dumping of waste irks locals Bajura, November 29 Badimalika Municipality has been disposing garbage collected from municipality vicinity on the roadside, haphazardly. As stipulated by Waste Management Act a local level has to dispose the garbage in consensus with the locals... Travel 30 Nov, 2019
Sanfe-Martadi road section obstructed BAJURA: Landslides at various parts of the Sanfe-Martadi road section in Bajura district have disrupted transportation in the region since Sunday. According to entrepreneur of Jay Malika Transport, Prithvi Rawal, the landslides have affected the... Travel 12 Aug, 2019